ITER
Adapted from Wikipedia · Adventurer experience
ITER stands for International Thermonuclear Experimental Reactor. It is a big science project to test if we can make energy from joining tiny particles together, called nuclear fusion. The ITER project is being built near Cadarache in southern France. Building started in 2013, and scientists hope to create their first small sun, called plasma, in the years 2033–2034. When that happens, ITER will be the largest fusion machine ever made.
The main goal of ITER is to show that a big fusion machine can work. Scientists want to learn how to control very hot plasma and test new technologies. They also want to test how to make more of a special material called tritium that is needed for fusion.
Many countries work together on ITER, including China, the European Union, India, Japan, Russia, South Korea, and the United States. Other countries like Australia, Canada, Kazakhstan, Switzerland, Thailand, and the United Kingdom also help in different ways. Building ITER has cost a lot of money and is one of the most expensive science projects ever. After ITER, scientists plan to build an even bigger machine called DEMO that could actually make electricity from fusion.
Background
Fusion tries to copy what happens in stars. In stars, super hot conditions push tiny parts of atoms together, making a lot of energy as heat and light. If we could do this on Earth, it could give us clean energy.
Unlike regular nuclear power, which splits atoms apart, fusion puts atoms together using very high heat. This can give us energy with very little pollution. The ITER project wants to use a special mix of atoms that gives the most energy. Building ITER has taken many years and a lot of money. The project started in 2013 and is still being built today near Cadarache in France. Scientists hope to learn more about how to make fusion power work well for the future.
Organisation history
The idea for ITER started in 1978 with a project called INTOR. It included the Soviet Union, the European Atomic Energy Community, the United States, and Japan. The project slowed down until 1985. At the Geneva Summit, Soviet leader Mikhail Gorbachev met with French President François Mitterrand and Ronald Reagan. They talked about working together on a new way to get energy from nuclear fusion.
Two scientists, American Alvin Trivelpiece and Russian Evgeny Velikhov, thought all countries should work together to build a fusion reactor. They believed no single country could afford it alone. After talks between leaders, the US joined the project. In 1986, four groups — Europe, Japan, the USSR, and the US — formed a committee to guide the project. By 1987, they named it the International Thermonuclear Experimental Reactor, or ITER, meaning "the way" in Latin.
More countries joined over the years, including China, South Korea, India, Australia, Kazakhstan, and Canada. In 2005, it was decided to build ITER in France. Construction began in 2007, and assembly started in 2020.
Directors-General
ITER is led by a group called the ITER Council. The Council is made up of representatives from the seven countries working on the project. They make big decisions and choose the director-general to lead the project. So far, there have been five directors-general.
Bernard Bigot became director-general in 2015 to help improve how ITER is managed. He was chosen again in 2019 for another five years. Sadly, he passed away in 2022, and Eisuke Tada temporarily led the project until a new director-general was chosen.
Objectives
ITER wants to prove that fusion power can be a large, clean energy source. The project aims to create a special kind of energy called fusion plasma that is ten times stronger than the energy we put in, for a short time. It also wants to keep this energy going steadily for up to 8 minutes.
The project will test important technologies like special magnets and robot maintenance. It will also study how to create a material called tritium and how to handle the energy from fusion reactions. All of this helps countries work together and prepare for future fusion power plants.
fusion energy gain factor superconducting magnets remote handling tritium breeding
Timeline and status
As of April 2022, ITER was about 85% done toward its first test run. Originally, this test run was set for late 2025, but in 2023, delays were expected. In July 2024, ITER shared a new plan. It now aims to start operations with a special type of energy in 2034, followed by more advanced tests in 2035 and even more in 2039.
The idea for ITER began in 1978 when the European Commission, Japan, United States, and USSR worked together on a project called the International Tokamak Reactor Workshop. This meeting was held under the International Atomic Energy Agency and aimed to see if fusion energy could be used for power and what more research was needed. Many scientists and engineers from each country studied how to contain fusion energy and design ways to use it.
In 1985, during a meeting in Geneva, a leader suggested that two countries work together on building a fusion energy machine. The ITER project officially started in 1988. Construction began in 2007, and building the main structure started in 2013.
Building began in July 2020. Once finished, ITER will be the largest machine for studying fusion energy, with a space for the energy to grow much bigger than any before. In 2023, a decision was made to change a part of the machine from a material called beryllium to tungsten, because beryllium can be dangerous.
In July 2024, the leader of ITER shared that the first test run will now happen no earlier than 2033. Getting the machine ready for full use will also take longer, to at least 2036. Fixing some parts that weren’t working right was expected to cost a lot of money.
| Date | Event |
|---|---|
| 1988 | ITER project officially initiated. Conceptual design activities ran from 1988 to 1990. |
| 1992 | Engineering design activities from 1992 to 1998. |
| 2006 | Approval of a cost estimate of €10 billion (US$12.8 billion) projecting the start of construction in 2008 and completion a decade later. |
| 2007 | Site construction begins |
| 2008 | Site preparation start, ITER itinerary start. |
| 2009 | Site preparation completion. |
| 2010 | Tokamak complex excavation starts. |
| 2013 | Tokamak complex construction starts. |
| 2015 | Tokamak construction starts, but the schedule is extended by at least six years. |
| 2017 | Assembly Hall ready for equipment. |
| 2018–2023 | Assembly and integration: December 2018: concrete support finished. July 2019: bottom and lower cylinder of the cryostat assembled from pieces. April 2020: first vacuum vessel sector completed. May 2020: bottom of the cryostat installed, tokamak assembly started. July 2020: machine assembly formally launched. October 2020: start welding vacuum vessel together. |
| 2024–2033 | Planned: Assembly and integration |
| 2033–2034 | Planned: Assembly ends; commissioning phase starts. Planned: Achievement of first plasma. |
| 2035 | Planned: Start of deuterium–deuterium plasma operation. |
| 2039 | Planned: Start of deuterium–tritium plasma operation. |
Reactor overview
See also: Nuclear fusion
When deuterium and tritium come together, they create a helium nucleus and a high-energy particle called a neutron.
Fusion can make a lot of energy. In stars, fusion makes energy, and on Earth, it might help us make electricity. To make fusion happen, the tiny parts inside atoms need to get very close. But they push away from each other because they have the same charge. So, they need a lot of energy to come close enough to fuse. In the ITER project, very high temperatures are used to give these parts enough energy. The ITER project uses special magnets to keep the hot, charged particles in place so they can fuse.
At these high temperatures, the particles move very fast and could escape if not contained. ITER uses magnetic fields to keep the particles from flying away. The project also tests materials that can handle the tough conditions inside a fusion reactor. Neutrons will be a main source of energy in ITER. The project will also test ways to create new fuel from these neutrons.
Technical design
The vacuum vessel is the main part of the ITER machine. It is a double-walled steel container that holds the plasma with magnetic fields. The ITER vacuum vessel will be twice as large and much heavier than any fusion vessel made before.
ITER will use deuterium-tritium fuel. The magnet system in the ITER tokamak will be the largest superconducting magnet system ever built.
To create fusion, plasma particles must be heated to very high temperatures, as high as 150 million °C. Many heating methods are needed to reach these temperatures.
The ITER cryostat is a large stainless steel structure that surrounds the vacuum vessel and the superconducting magnets. It provides a super-cool vacuum environment.
The divertor is a device inside the tokamak that helps remove waste and impurities from the plasma while the reactor is running.
The ITER tokamak will use connected cooling systems to control the heat made during operation.
Location
It took a long time to decide where to build ITER. Japan suggested a place called Rokkasho. Europe looked at two spots: one in Cadarache, France, and another in Vandellòs, Spain. In November 2003, Europe chose Cadarache.
Canada also suggested a site in Clarington in May 2001 but decided not to continue in 2003.
Finally, the decision was between France and Japan. On 28 June 2005, leaders agreed to build ITER in Cadarache, France, with Japan getting special roles and money to build facilities in Japan.
The group in charge of Europe’s part, called Fusion for Energy, is in Barcelona, Spain. Another important place for testing is being built in Padua, Italy.
Most buildings at ITER will have a special look with shiny steel and grey metal to match the area and keep the buildings cool.
Participants
ITER is a big science project where many countries work together. Right now, seven main countries and groups are part of it: China, the European Union, India, Japan, Russia, South Korea, and the United States.
Some other places, like Australia, Canada, Kazakhstan, and Thailand, help out too. They share ideas and work together in special ways. The project is led by a group called the ITER Council, which makes big decisions about how things run.
Domestic agencies
Each member of the ITER project has its own agency to help build and support the project. These agencies have their own staff and budgets and manage contracts for building parts of the reactor.
The European Union’s agency, called Fusion for Energy, is based in Barcelona, Spain. It helps design and build important parts like the vacuum vessel and magnets. China’s agency works on parts such as magnets and the first wall, and also runs experiments in Chengdu and Hefei. India’s agency, based in Ahmedabad, helps build parts like the cryostat and cooling systems. Japan’s agency, based in Chiba, helps design and build parts like the central solenoid coils and plasma diagnostics. Korea’s agency, based in Daejeon, works on parts like sections of the vacuum vessel and the tritium storage system. The Russian Federation’s agency helps supply special equipment and conductors for the magnetic system. The US agency, based at Oak Ridge National Laboratory in Tennessee, helps design and build parts like the tokamak cooling system and magnet systems.
Funding
In 2006, leaders agreed to build a special science project called ITER. They first thought it would cost about €5.9 billion over ten years. But by 2008, they realized it would cost closer to €19 billion. By 2016, the cost was even higher, over €22 billion.
The money for ITER comes from many countries working together. The European Union, where the project is being built, pays the biggest share. Other countries like China, India, Japan, South Korea, Russia, and the United States also help pay. Most of the money is given as materials and services instead of cash, using something called ITER Units of Account.
The United States changed how much it pays over time. In 2018, the country increased its support to help finish the project. Europe also adjusted its budget several times to make sure ITER could be built properly.
Manufacturing
Building the ITER tokamak is like putting together a giant three-dimensional puzzle. Parts are made all around the world and then brought to France to fit together. This helps share skills and boost economies for the countries involved.
Many companies and groups have worked on ITER. In Europe, big contracts have gone to teams from different countries. In America, companies like General Atomics are making important parts. China, Russia, India, and Japan are also helping by making different pieces for the project. There have been some delays, but the team hopes to start testing in the 2030s.
Criticism
The ITER project has faced some criticism. Some people worry about possible environmental effects and whether it will help fight climate change. When France was chosen as the location in 2005, some European environmentalists opposed it. One French politician thought money should go to fighting global warming instead. However, another group supported ITER as a way to address climate change.
Some researchers believe other fusion projects could be cheaper and more effective than ITER. There have also been concerns about the design of the tokamak.
Critics also worry about the supply of tritium, a material needed for the experiment. ITER will use all existing tritium supplies.
Supporters argue that much of the criticism is not accurate. They say fusion power would produce much less radioactive waste than traditional nuclear power and would not create materials for weapons. They also believe fusion power could provide reliable electricity with almost no pollution. Supporters say that testing materials under intense conditions is necessary to understand how fusion power could work, and that ITER is a vital step in this research. They point out that fusion has the potential to be a clean energy source with many benefits.
Similar projects
Before ITER, there were other important projects like JET, Tore Supra, MAST, SST-1, EAST, and KSTAR. Today, scientists are working on new ideas for fusion reactors, such as NIF, W7X, T-15MD, STEP, SPARC, SST-2, CFETR, DEMO, and K-DEMO. These projects help researchers learn more about creating clean energy from fusion.
Images